We build your hallturnkey
Groundwork, foundations and frame from one contractor – with our own employees. One point of contact throughout the project.
- 500 m² hall package from €355,000 (VAT 0%)
- Construction time for a 500 m² hall only 2 months
- Our own employees – fewer interfaces and less waiting
- Reply to your enquiry within the same working day
Request a free quote
Tell us briefly about your project – incomplete details are fine.
Choose your hall package
Fixed package price for a normally founded plot.
Scope of delivery
What the package price includes
- Groundwork (height difference under 1 m)
- Foundations: footings and plinth elements
- Frame, lift doors and windows
- Main electrical board and general lighting
- Architectural drawings for the building permit
- Air-to-water heat pump and underfloor heating pipes as a bonus
Not included in the base price
- Rock excavation, piling and removal of contaminated soil
- Building permit fees and other authority fees
- Special plot requirements – assessed in the quote
The package price applies to the scope of delivery on a normally founded plot. The final price is confirmed based on the plot, location and project-specific requirements.
Completed projects
See what Parmasson halls look like when finished.
How the project proceeds
- 1
Quote request
You send the form or call us. We reply within the same working day.
- 2
Plot and design
We go through the plot, schedule and needs. Architectural drawings for the building permit are included.
- 3
Construction
Our own employees build the hall – from groundwork to frame and installations.
- 4
Handover
We hand over the finished hall turnkey.
Frequently asked questions
How much does it cost to build a hall?
The 500 m² hall package starts from €355,000 and the 1000 m² package from €679,000 (VAT 0%). The final price is confirmed based on the plot, location and project-specific requirements.
How long does it take to build a hall?
A 500 m² hall takes about 2 months and a 1000 m² hall about 5 months. See completed projects in our references.
Is a building permit required?
Yes. Architectural drawings for the building permit are included in the package. Building permit fees and other authority matters are the client's responsibility unless agreed otherwise.
What if the plot needs rock excavation or piling?
Rock excavation, piling and removal of contaminated soil are not included in the base price. We assess them at the quote stage based on plot information.


