Completed hall building in Sipoo

Hall building
Sipoo

Hall building Completed
1,500 m²
Total floor area
4 months
Construction time
Sipoo
Location
Project
Hall building
Frame
Glulam
Floor area
1,500 m²
Construction time
4 months
Location
Sipoo

A hall building in Sipoo with a total floor area of 1,500 m². The project was completed in about 4 months. The photos show the build phases from earthworks and the stormwater system to the glulam frame, the interior and the solar panels on the roof.

Photo gallery
Completed hall building in Sipoo
Excavator and foundation formwork on site
Stormwater system installation – pipework and manholes
Installing stormwater tanks with an excavator
Glulam columns and mobile crane during the frame phase
Hall interior – timber frame and vapour barrier
Solar panels on the hall roof

Planning a similar construction project?

Request a quote →

Interested?

Request a free quote. We'll get back to you within the same business day!

WhatsApp +358 44 342 3867