Toimisto- ja tuotantotila Vantaa – Parmasson Rakennus Oy

Office and
production facility
Vantaa

Office space Production facility Completed Turnkey
2 500 m²
Total floor area
5 kk
Construction time
Vantaa
Location
Project
Office and production facility
Delivery
Turnkey
Floor area
2 500 m²
Construction time
5 kk
Location
Vantaa
5 months
Construction time

The entire 2,500 m² office and production building was completed in about five months, delivered turnkey.

Own employees
Done with our own team

Almost all of the work was carried out by our own employees. Fewer contractors means fewer interfaces and no unnecessary waiting between work phases.

About the project

A combined office and production building with a total floor area of 2,500 m² was built in Vantaa. It includes about 1,300 m² of production space and about 900 m² of showroom, office and social areas, with workplaces for around 70 people.

The project was delivered on a turnkey basis: we handled it from groundwork and foundations through the frame and facade to interior works. The construction time was only about 5 months, which called for tight scheduling and careful sequencing of the work phases. Almost all of the work was done by our own employees, so schedule and quality stayed in our own hands.

The more contractors, the more interfaces. Each phase waits for the previous one, responsibilities blur and information travels slowly down the chain. That means unnecessary waiting and a longer construction time. Companies that build halls and commercial premises may not have a single employee of their own – all of the work is subcontracted. When most of the work is done by our own employees, interfaces stay few and the phases follow each other smoothly – one reason a 2,500 m² building was completed in about 5 months.

The production side has a spacious hall with a concrete floor. The office side includes open-plan areas, glass-walled work and meeting rooms, and social facilities. The facade is finished in a dark-toned cladding.

Photo gallery

The photos show the project from groundwork to the completed building.

Groundwork and foundations

Groundwork
Groundwork
Foundation formwork and reinforcement
Foundation formwork and reinforcement

Frame and facade

Concrete frame going up
Concrete frame going up
Concrete frame and floors
Concrete frame and floors
Facade and timber structures in progress
Facade and timber structures in progress
Timber canopy – under construction
Timber canopy – under construction
Facade – under construction
Facade – under construction
Yard area works
Yard area works
Rear of the building – exterior works in progress
Rear of the building – exterior works in progress

Completed project

Facade – completed
Facade – completed
Facade – completed
Facade – completed
Facade – completed
Facade – completed
Production hall facade – completed
Production hall facade – completed
3D visualization
3D visualization

Interiors

Production hall – completed
Production hall – completed
Office – glass partitions
Office – glass partitions
Office – open-plan area
Office – open-plan area
Office room
Office room
Office – furnished
Office – furnished
Office space – interior
Office space – interior

Planning a similar construction project?

Request a quote →

Interested?

Request a free quote. We'll get back to you within the same business day!

WhatsApp +358 44 342 3867