Industrial hall
roof
Imatra
5,000 m²
Roof area
2 weeks
Total duration
Imatra
Location
Project
Industrial hall roof
Delivery
Roof renovation
Floor area
5,000 m² (roof)
Total duration
2 weeks
Location
Imatra
Roof renovation of an industrial hall in Imatra, roof area 5,000 m². The work included replacing the load-bearing profiled sheet roofing and installing the new roof, ridge ventilation, a rainwater system and roof safety products. The project was completed in about two weeks. We carry out roof renovations of halls and large sheet-metal roofs on new-build projects.